ORBIDRON completes drone-assisted SS4 + CAP on a Suezmax crude oil tanker in 6 days
In January 2026, ORBIDRON completed a drone-assisted Special Survey No.4 (SS4) and CAP project on a Suezmax crude oil tanker in 6 days, applying a hybrid methodology that combined drone-enabled close-up inspection and UTM for hard-to-reach areas with manual UTM for safely accessible structures.